Tuesday, August 30, 2011

There's bats in the belfry!!

Our insulation bats have been installed in the house and it appears that we are now ready for plaster to begin.   Some of our downpipes have also been installed as well.

Most of the items that we agreed should be fixed internally appear to have been done apart from one noggin next to the lounge room window that is still hanging out!!!   An email to the SS should see that fixed before it is plastered over.

I met with the doors/flywire screen place today onsite and have placed the order for all barrier doors and screens to be installed immediately after handover.   Check!!!  Another job out of the way for the time being.

Had a look through LouNeen & Tash's windows and your houses are looking great peeps!!
Anyway here's some pics of the latest.
This Noggin needs fixing!!


Powerpoints for my TV with conduit for all those leads!!


Snug as a bug in a rug!!



Monument down pipes


4 comments:

Linni said...

Looks great Janine, falling a little more in love with the facade everytime I see it! Will look so different inside when the plaster is done. How exciting!!

Lou and Neen said...

Fantastic!!! Might have to have a sneaky walk through this weekend!!!

PuzSol said...

I can't believe the plumber decided to run a (water?) pipe though spaghetti junction (TV point picture). What are the chances? Shouldn't make any difference, it just makes it look more crowded and means you will have to be a bit more careful if you add another plug point there to not puncture the water.

Good progress, nice to see things moving on.

Tash said...

Looking fab Janine, its getting a little exciting now, once the plaster goes up you will be able to get a good feel of all your rooms!!